Specializing in redundant PLC, HMI, servo systems and precision reducer, coupling and other modern industrial equipment systems developed and produced Zsa Industrial Equipment Co., Ltd. has a high reputation in the industry, advanced technology various automation equipment, strength plc programmable logic controller Strong and excellent services, PLC, etc. Compared with the same redundant PLC products, the advantages are very prominent. For this reason plc cpu modules will introduce H series PLC (programmable logic controller system large) functions and basic equipment:
1.CPU base (in addition to providing Power and CPU socket, there were 4,6,8 slot I / O module slots).
2 power supply modules.
3.CPU module. 4.I / O modules (depending on the need to select the appropriate modules can connect up to eight modules).
5 special function modules.
6 personal computer or notebook computer, a control program edit, modify use.
PLC is the center of high-function control system, its software compatible MODICONPLC, instruction, plc cpu modules are plc intelligent controller compatible with communication protocols etc MODICONPLC, widely used in water treatment, buildings, machinery and processing industries. In the application can be an independent redundant control system, but also through a special built-in functions: to connect multiple PLC communication instruction to achieve distributed control functions.
cpu modules is the heart of the PLC system. It executes the control instructions of the control logic program. It also communicates with other devices, which can include I/O Devices, Programming Devices, computers, Networks, and even other plcs and also performs diagnostics tasks.
2014年4月27日星期日
2014年4月17日星期四
What is the definition of cpu modules plc
A friend asked: What is the definition Will module power is?
Power module can be directly mounted on a printed circuit board power supply, because of the many advantages of a modular structure, and therefore is widely used in power switching device module, the access equipment, mobile communication, microwave communication, and optical transmission, routers, etc. communications and automotive electronics, aerospace and so on.
Advantage of the power module
Simple design. Just a cpu modules plc, accompanied by industrial automation plc a small number of discrete components, you can get the power.
Power modules shorten the development cycle. Module power is generally a wide range of input and output options. Users can also repeat the superposition or cross superimposed to form a combination of modular power supplies, multi-channel input, output, greatly reduced prototype development time.
Changes flexible. Product design To change, simply convert or another suitable power supply module can be connected in parallel.
Technical requirements low. cpu modules plc generally equipped with a standardized front-end, highly integrated power modules and other components, so make power design easier.
Shell has the plc modular form module power structure collectors sink, radiator and shell Trinity achieve a module power conduction cooling, the temperature is close to the minimum value of the power supply. At the same time, it gives the power module packaging Jinyu their table.
High quality and reliable. Power modules are used in fully automated production in general, and with high-tech production technology, stable quality and reliable.
Versatile: module power can be widely used in aerospace, locomotive ships, military weapons, power generation and programmable logic control plc distribution, telecommunications, metallurgy, mining, automatic control, household appliances, instrumentation and scientific experiments in various fields of social production and life, especially in the field of high technology and high reliability plays an irreplaceable role.
Power module can be directly mounted on a printed circuit board power supply, because of the many advantages of a modular structure, and therefore is widely used in power switching device module, the access equipment, mobile communication, microwave communication, and optical transmission, routers, etc. communications and automotive electronics, aerospace and so on.
Advantage of the power module
Simple design. Just a cpu modules plc, accompanied by industrial automation plc a small number of discrete components, you can get the power.
Power modules shorten the development cycle. Module power is generally a wide range of input and output options. Users can also repeat the superposition or cross superimposed to form a combination of modular power supplies, multi-channel input, output, greatly reduced prototype development time.
Changes flexible. Product design To change, simply convert or another suitable power supply module can be connected in parallel.
Technical requirements low. cpu modules plc generally equipped with a standardized front-end, highly integrated power modules and other components, so make power design easier.
Shell has the plc modular form module power structure collectors sink, radiator and shell Trinity achieve a module power conduction cooling, the temperature is close to the minimum value of the power supply. At the same time, it gives the power module packaging Jinyu their table.
High quality and reliable. Power modules are used in fully automated production in general, and with high-tech production technology, stable quality and reliable.
Versatile: module power can be widely used in aerospace, locomotive ships, military weapons, power generation and programmable logic control plc distribution, telecommunications, metallurgy, mining, automatic control, household appliances, instrumentation and scientific experiments in various fields of social production and life, especially in the field of high technology and high reliability plays an irreplaceable role.
2014年4月15日星期二
plc cpu modules in cooling technology analysis
To ensure job stability and prolong the use life of the chip may not exceed the maximum temperature 85 ℃ [2]. Device operating temperature is increased by 10 ℃, its failure rate doubling [ 3 ] . In order to ensure the normal operation of electronic equipment safe and reliable long-term operation of the resistance, the use of appropriate , reliable way to control the temperature of electronic components , plc cpu modules make it work in the programmable logic controller manufacturer environmental conditions in which the stable operation of the request does not exceed the maximum temperature . With the heat flux miniaturization of electronic components , micro- miniaturization, high integration of integrated circuits and micro- assembly is carried out , components, assemblies progress from time to time , the thermal design are also facing a severe challenge. The quality of construction of thermal power supply system can directly affect the long time stability . Heat transfer and flow brawn to school for the foundation , separate detailed structure of electronic equipment , rational and efficient design of programmable controller the cooling installation , combined with advanced thermal analysis software simulation research, electronic devices invented a good working environment to ensure that heating components and power systems at a stable temperature can be allowed to work securely DC / DC power module thermal analysis process 1 ) analysis of the power supply circuit corresponding thermal circuit , plc cpu modules will certainly heat transfer pathway , draw the equivalent thermal model . 2 ) a power supply circuit configured to analyze planning , and certainly the main heating elements . 3 ) Application LSL establish a 3D model of the power supply of the radiator, then the application of plc controller professional thermal simulation software EFD.Pro, based on current science and brawn numerical heat transfer theory , the practice of separating the thermal boundary conditions , stop the simulation model to establish imitation .
4 ) Stop the simulation results analysis . After stopping the simulation model to imitate , mimic the results of its analysis of whether the power fit to work requests.
4 ) Stop the simulation results analysis . After stopping the simulation model to imitate , mimic the results of its analysis of whether the power fit to work requests.
2014年4月14日星期一
cpu modules plc three modules were introduced
Each of the three modules are described : ( a ) video capture module
Video capture module includes built video capture wireless transmission module , such as: wireless cameras. Responsible for monitoring live video capture and compression, transmission became available for digital signals , it is not necessarily fixed within a confined area , it can be placed in any 4G signal can be received at the mobile device . Need to integrate wireless camera lens , video compression cards, wireless Internet access modules and other equipment. Network remote monitoring center can determine the specific location of the video data according to numbers from the address of each wireless camera wireless Internet access module.
Wireless camera video data is very large , in order to transmit the cpu modules plc must be compressed . Select the plc sequence of events recording module correct video compression standards to ensure clarity and transmission fluid. This is our system is an important factor in the design considerations . (B ) transmitting module
Network transmission module is responsible for transferring the video data channel , cpu modules plc Its role is to ensure a good transfer rate and delay level. In wireless video surveillance system , 4G technology can guarantee a good wireless transmission rate and delay requirements. Through the wireless transmission of video data goes into a wired plc temperature module transmission channel. The wired transmission path includes the IP transfer network operator , service gateways , PDN gateways , Internet video monitoring center and reach the wired transmission channel. After the video data is transmitted through the network module, the video monitoring center can download the video data processing and storage. (C ) video monitoring module via Internet, Ethernet connectivity , video surveillance center can have multiple physical addresses , video monitoring center is responsible for video information storage, management , querying, and real-time monitoring tasks , including Programmable Input Module video storage server management and monitoring server.
The system has a data transfer rate is high, image transmission delays small , wide scope of monitoring , access to end-users and more features , suitable for most industrial users .
Video capture module includes built video capture wireless transmission module , such as: wireless cameras. Responsible for monitoring live video capture and compression, transmission became available for digital signals , it is not necessarily fixed within a confined area , it can be placed in any 4G signal can be received at the mobile device . Need to integrate wireless camera lens , video compression cards, wireless Internet access modules and other equipment. Network remote monitoring center can determine the specific location of the video data according to numbers from the address of each wireless camera wireless Internet access module.
Wireless camera video data is very large , in order to transmit the cpu modules plc must be compressed . Select the plc sequence of events recording module correct video compression standards to ensure clarity and transmission fluid. This is our system is an important factor in the design considerations . (B ) transmitting module
Network transmission module is responsible for transferring the video data channel , cpu modules plc Its role is to ensure a good transfer rate and delay level. In wireless video surveillance system , 4G technology can guarantee a good wireless transmission rate and delay requirements. Through the wireless transmission of video data goes into a wired plc temperature module transmission channel. The wired transmission path includes the IP transfer network operator , service gateways , PDN gateways , Internet video monitoring center and reach the wired transmission channel. After the video data is transmitted through the network module, the video monitoring center can download the video data processing and storage. (C ) video monitoring module via Internet, Ethernet connectivity , video surveillance center can have multiple physical addresses , video monitoring center is responsible for video information storage, management , querying, and real-time monitoring tasks , including Programmable Input Module video storage server management and monitoring server.
The system has a data transfer rate is high, image transmission delays small , wide scope of monitoring , access to end-users and more features , suitable for most industrial users .
Process plc cpu modules and work characteristics
(A) analysis of the controlled object and made a detailed analysis of the controlled object to control the process and work characteristics, understand charged with the object of mechanical, electrical, fluid between the controlled object to the proposed control system PLC control requirements, to determine control scheme proposed design task. (B) determine the input / output control apparatus according to the system requirements, the plc sequence of events module system determines all the required input devices (such as: buttons, position switch, switch, and various sensors) and output devices (such as: contactors, solenoid valves, , signal lights, and other actuators, etc.), in order to determine the relevant PLC input / output device to determine the PLC I / O points (three) Select PLC
PLC PLC options include the choice of models, the capacity, I / O modules, power supplies, etc. (d) allocate I / O points and peripheral hardware design PLC line 1. Assign I / O points to draw the PLC I / O points and connection diagram or table correspondence between input / output devices, the part 2 can also be designed to draw the line PLC peripheral hardware rest of the system electrical circuit diagram in step 2, including the main circuit and did not enter the PLC control circuits, etc. . By the PLC's I / O connection diagram and PLC peripheral electrical circuit diagram of a system consisting of electrical schematics. Electrical wiring system hardware have been identified so far. (E) Program Design 1. Program design based on the control system requirements, the use of appropriate design approach to designing the PLC program. To control procedures in order to meet the system requirements of the main line, each writing achievement of the control functions of each sub-task or procedure, and gradually improve the system specified function. In analog output module addition, the program should normally include the following 1) initialization routine. PLC after power on, usually do some initialization operation, to start to make the necessary preparations to avoid system malfunction. The main contents of the initialization process are: the certain data area, the counter is cleared, etc., some of the data required for recovery of the data area, the relay is set for some or reset, so some initial display state.
2), such as testing, troubleshooting and display program. These procedures are relatively independent, generally when the program is completed and then add the basic design.
3) Protection and chain procedures. Protection and chain is an indispensable part of the program, must be considered carefully. The control logic it can avoid the confusion caused by the illegal operation.
2 simulation debugging program
Process simulation debugging basic idea is to facilitate the simulation of the actual site in the form of state, to create the necessary conditions for an environment to run the program. Depending on the way to generate on-site signal simulation debugging hardware method and two forms of simulation software simulation.
1) is to use some of the hardware simulation plc input output modules hardware device (such as a PLC or some other use input device, etc.) the analog signals to generate a field, and these signals are hard-wired connection connected to the input of the PLC system, the timeliness than strong. 2) simulation software is written in another set in the PLC simulation program to simulate the live signal, which is simple, but not easy to ensure timeliness. Simulation debugging, debugging can be segmented approach, and use the programmer's monitoring function.
PLC PLC options include the choice of models, the capacity, I / O modules, power supplies, etc. (d) allocate I / O points and peripheral hardware design PLC line 1. Assign I / O points to draw the PLC I / O points and connection diagram or table correspondence between input / output devices, the part 2 can also be designed to draw the line PLC peripheral hardware rest of the system electrical circuit diagram in step 2, including the main circuit and did not enter the PLC control circuits, etc. . By the PLC's I / O connection diagram and PLC peripheral electrical circuit diagram of a system consisting of electrical schematics. Electrical wiring system hardware have been identified so far. (E) Program Design 1. Program design based on the control system requirements, the use of appropriate design approach to designing the PLC program. To control procedures in order to meet the system requirements of the main line, each writing achievement of the control functions of each sub-task or procedure, and gradually improve the system specified function. In analog output module addition, the program should normally include the following 1) initialization routine. PLC after power on, usually do some initialization operation, to start to make the necessary preparations to avoid system malfunction. The main contents of the initialization process are: the certain data area, the counter is cleared, etc., some of the data required for recovery of the data area, the relay is set for some or reset, so some initial display state.
2), such as testing, troubleshooting and display program. These procedures are relatively independent, generally when the program is completed and then add the basic design.
3) Protection and chain procedures. Protection and chain is an indispensable part of the program, must be considered carefully. The control logic it can avoid the confusion caused by the illegal operation.
2 simulation debugging program
Process simulation debugging basic idea is to facilitate the simulation of the actual site in the form of state, to create the necessary conditions for an environment to run the program. Depending on the way to generate on-site signal simulation debugging hardware method and two forms of simulation software simulation.
1) is to use some of the hardware simulation plc input output modules hardware device (such as a PLC or some other use input device, etc.) the analog signals to generate a field, and these signals are hard-wired connection connected to the input of the PLC system, the timeliness than strong. 2) simulation software is written in another set in the PLC simulation program to simulate the live signal, which is simple, but not easy to ensure timeliness. Simulation debugging, debugging can be segmented approach, and use the programmer's monitoring function.
2014年4月10日星期四
The main performance cpu modules plc
The modular micro PLC system to meet the medium and small -scale performance requirements of various performance modules can be very good to meet and adapt to automation tasks simple and practical distributed plc controller suppliers architecture and multi- interface network capabilities , the application is very flexible and user-friendly and simple no fan design increases when the control task , cpu modules plc freely scalable lot of integrated features make it very robust modular micro PLC system to meet the low-end performance requirements. Modular , fanless design , easy to implement distributed architecture and operation of a variety of performance levels to facilitate CPU, the full range of modules with user- friendly features that allow the user to select the appropriate modules depending on the application . When expanded mandate , they can always upgrade the input module plc controller through the use of add-on modules . Therefore, it can create a fully integrated control system , cpu modules plc use in safety-related and non- safety-related tasks coexist plant. Using the same standard tools for configuring and programming the entire plant .
2014年4月9日星期三
plc cpu modules connected to 4G steps
1 When using the terminal, why type "AT + CFUN = 1", returned ERROR?
A: In the instructions to enter the correct premise, first confirm whether the 4G module with pc connection is successful, check plc cpu modules Device Manager - Universal Serial Bus Controller is connected to plc cpu module the device, if the device exists, then make sure USB line with the PC connection is successful, and then determine whether the module is turned on, press power button for 5 seconds, and power module, when returning + CEREG: 1:00, enter "? AT + COPS", registered network. 2 How to check the current registered network provider?
Answer: Enter "? AT + COPS", according to the return value to determine the current registered network provider. Returns + COPS: 0,0, is not registered to the network + COPS: 0,0, "CHINA MOBILE", 0 indicates registration to China Mobile's 2G network; + COPS: 0,0, "CHINA MOBILE", 2 means that the registration to China Mobile's 3G network + COPS: 0,0, "CHINA MOBILE", 7 indicates registration to China Mobile 4G network; 3 Why type, return ERROR. "AT + COPS?"?
A: In the instructions to enter the correct premise, the SIM card may be the problem, first check whether there is a SIM card slot confirm balances, confirm the SIM card and the antenna is plugged in, then enter "AT ^ DUSIMR" SIM card status query returns ^ DUSIMR: 1 indicates the plc input output modules presence of a SIM card; enter "AT + CLCK =" SC ", 2" check SIM card LOCK state, return "+ CLCK: 0 \ r \ n", the SIM card is not LOCK; enter "AT + CPIN? "check whether you need to enter the PIN code, return" + CPIN: READY "said PIN has been entered, and do not need to enter a PIN code;
4 How to activate data services?
A: Enter the "AT + CGDATA =" M-0000 ", 1" when returning CONNECT, surface data service activation is successful, then you can find the network connection is successful;
5 Enter the AT commands connect to the cpu modules plc Internet course, if there is a power outage, you can continue to operate in serial tool it?
A: No, plc cpu modules serial communication tool again to close the operation;
6 Enter the AT commands connect to the Internet course, if there is usb interface is bad, you can continue to operate in serial tool it?
A: No, you need to re-open the serial port and enter "AT + CFUN = 4" soft shutdown, then enter "AT + CFUN = 1" to get started. 7 Why 4G network connection (to activate data services) yellow exclamation mark appears, the network connection status is displayed without Internet access?
A: In the case of an unstable 4G network, the network may jump to 3G or 2G network, but the SIM card only supports 4G networks,
Enter the activation of data services in the command (AT + CGDATA = "M-0000", 1) before, enter "AT ^ DSTMEX = 1,7", this command indicates that only select Connect 4G network, and then enter "AT + CGDATA =" M-0000 ", 1" to activate data services, conduct 4G network connection.
A: In the instructions to enter the correct premise, first confirm whether the 4G module with pc connection is successful, check plc cpu modules Device Manager - Universal Serial Bus Controller is connected to plc cpu module the device, if the device exists, then make sure USB line with the PC connection is successful, and then determine whether the module is turned on, press power button for 5 seconds, and power module, when returning + CEREG: 1:00, enter "? AT + COPS", registered network. 2 How to check the current registered network provider?
Answer: Enter "? AT + COPS", according to the return value to determine the current registered network provider. Returns + COPS: 0,0, is not registered to the network + COPS: 0,0, "CHINA MOBILE", 0 indicates registration to China Mobile's 2G network; + COPS: 0,0, "CHINA MOBILE", 2 means that the registration to China Mobile's 3G network + COPS: 0,0, "CHINA MOBILE", 7 indicates registration to China Mobile 4G network; 3 Why type, return ERROR. "AT + COPS?"?
A: In the instructions to enter the correct premise, the SIM card may be the problem, first check whether there is a SIM card slot confirm balances, confirm the SIM card and the antenna is plugged in, then enter "AT ^ DUSIMR" SIM card status query returns ^ DUSIMR: 1 indicates the plc input output modules presence of a SIM card; enter "AT + CLCK =" SC ", 2" check SIM card LOCK state, return "+ CLCK: 0 \ r \ n", the SIM card is not LOCK; enter "AT + CPIN? "check whether you need to enter the PIN code, return" + CPIN: READY "said PIN has been entered, and do not need to enter a PIN code;
4 How to activate data services?
A: Enter the "AT + CGDATA =" M-0000 ", 1" when returning CONNECT, surface data service activation is successful, then you can find the network connection is successful;
5 Enter the AT commands connect to the cpu modules plc Internet course, if there is a power outage, you can continue to operate in serial tool it?
A: No, plc cpu modules serial communication tool again to close the operation;
6 Enter the AT commands connect to the Internet course, if there is usb interface is bad, you can continue to operate in serial tool it?
A: No, you need to re-open the serial port and enter "AT + CFUN = 4" soft shutdown, then enter "AT + CFUN = 1" to get started. 7 Why 4G network connection (to activate data services) yellow exclamation mark appears, the network connection status is displayed without Internet access?
A: In the case of an unstable 4G network, the network may jump to 3G or 2G network, but the SIM card only supports 4G networks,
Enter the activation of data services in the command (AT + CGDATA = "M-0000", 1) before, enter "AT ^ DSTMEX = 1,7", this command indicates that only select Connect 4G network, and then enter "AT + CGDATA =" M-0000 ", 1" to activate data services, conduct 4G network connection.
订阅:
博文 (Atom)